given: critical path time = 32 days and variance v² = 9. what is the probability that the project will be completed between 29 and 35 days

Answers

Answer 1

The probability that the project will be completed between 29 and 35 days is approximately 0.6826, or 68.26%.

We can use the normal distribution to estimate the probability that the project will be completed between 29 and 35 days, assuming that the distribution of completion times is approximately normal.

First, we need to calculate the standard deviation (σ) of the completion time.

Since the variance is v² = 9, the standard deviation is σ = √v² = √9 = 3.

Next, we need to find the z-scores for the lower and upper bounds of the interval we are interested in:

z1 = (29 - 32) / 3 = -1

z2 = (35 - 32) / 3 = 1

Using a standard normal distribution table or a calculator with normal distribution function, we can find the probabilities associated with these z-scores:

P(Z < -1) = 0.1587

P(Z < 1) = 0.8413

The probability that the project will be completed between 29 and 35 days is equal to the difference between these two probabilities:

P(29 < X < 35) = P(Z < 1) - P(Z < -1) = 0.8413 - 0.1587 = 0.6826.

To learn more about the z score;

https://brainly.com/question/15016913

#SPJ1


Related Questions

ASAP PLEASE I WILL MAKE BRAINIEST

The coordinates of the point UU are (-4,3)(−4,3) and the coordinates of point VV are (-4,-9).(−4,−9). What is the distance, in units, between the point UU and point V?V?

Answers

Answer:

12 units

Step-by-step explanation:

Given points:

U(-4, 3) and V(-4, -9)

The line segment between the given points is vertical as their x-coordinates are same.

The distance between the points is the difference between their y-coordinates:

3 - (-9) = 12 units

Which is the equation of a line that has a slope of 1 and passes through point (5, 3)?
O y=x-2
y = x + 2
O y = x + 3
O y=x-5
Save and Exit

Answers

Answer:

y=x-2

Step-by-step explanation:

y-y1=m(x-x1)

y-3=1(x-5)

y-3=x-5

y=x-5+3

y=x-2

Can someone please help with this math question?

Answers

Answer:

Its easy

Step-by-step explanation:

1) 12

2)76

3)21.5

4)22.0

Mr. Johnson sells erasers for $3 each. He sold 96 erasers last week and he sold 204 erasers this week

Answers

Answer:

288

Step-by-step explanation:

it's pretty simple, if u do 96 * 3, it will be that. yw :)

Answer:

He made $324.

Step-by-step explanation:

96 x 3 = 288

204 x 3 = 612

So, then 612-288 = 324

Hope this helped!

What is the value of X

Answers

Answer:

The Value of X in 2nd one can be 14√3.

The Value of X in 1st one can be 6√3.

Step-by-step explanation:

2.)here we used tan 60° formula with P/B as x/14 respectively.

as the value of tan 60° is √3, we got,

√3= x/14

x= 14√3.

1.) Here we used sin 30° formula with 1/√2 as P/H

so we got,

6/x= 1/√2

hence the answer comes:-

x= 6√2..

Hope so it helped you........

Something and 14√3.

Steps

The person above me has calculated something.

The way to get 14√3 can be seen in the image above.

Does 18x-(9x+2)=4x have a solution?

Answers

Answer:

Yes

Step-by-step explanation:

9x - 4x = 2

5x = 2

x = 2/5

x = 0.4

Please help I really need it

Answers

Answer:

X = -2, Y = 13

X = 0, Y = 9

X = 2, Y = 5

X = 4, Y = 1

Step-by-step explanation:

Take the value given for X and plug it into the equation. For example, when X = -4, you will make your equation look as follows:

y = -2(-4) + 9

Simplify it:

y = 8 + 9

y = 17

Repeat this process with the rest of the X values to get your Y values.

you ride through some wet paint on your bike creating a red spot on the tire. write a cosine equation to model the height of the red spot over the distance you ride.
Your bike tire has a radius (r) of 11 inches.
The period is the circumference of the tire (2pir)
start the cycle when the spot is at the top of the tire

Answers

Answer: y = 11 cos (1/11x) +11

Step-by-step explanation:

Writing a cosine equation to model the height of the red spot over the distance you ride will be:

D. [tex]y=11 cos (1/11x) + 11[/tex]

Some cosine formulas are:

[tex]cos A= (b2+c2-a2)/(2bc)[/tex]

What is a cosine equation?

A cosine equation or formula is is one of the three most common trigonometric function. It is the trigonometric function that equals the ratio of the side adjacent to an acute triangle to the hypotenuse.

Therefore the correct answer is option D.

Read more about cosine equation here:

https://brainly.com/question/17075439

Unrestrained growth of cells in a petri dish can be extremely rapid, with a single cell growing into a number of cells, N, given by the formula, N(t) = 8t, after t hours.

Enter the formula for the number of cells in the petri dish when a culture is started with 30 isolated cells.

The new formula is N(t) = .

How many cells do you expect after 3 hours?

You should expect ___
cells.

Answers

Answer:

New Formula is [tex] N(t) = 30t [/tex]

You should expect 90 cells

Step-by-step explanation:

✔️The new formula that would represent the number of cells when 30 isolated cells are used to start a culture would be:

[tex] N(t) = 30t [/tex]

✔️Number of cells, N(t), to expect after 3 hours, t:

Substitute t = 3 into [tex] N(t) = 30t [/tex]

Thus:

[tex] N(30) = 30*3 [/tex]

[tex] N(30) = 90 [/tex]

You should expect 90 cells

Four square tiles, each of side 12 cm are used to make a bigger tile. Find the perimeter of the larger tile.

Answers

Answer:

192 cm

Step-by-step explanation:

Given that:

Side length of small tiles = 12cm

Number of small tilea used to make a bigger tile = 4

The perimeter of larger tile:

Perimeter of a square = 4s

Where, s = side length

Side length of larger tile :

4 * side length of smaller tile

4 * 12

= 48 cm

Hence,

Perimeter of a larger square tile = 4s

4 * 48cm

= 192 cm

Solve - x/6 less than or equal to 3

Answers

Answer: x is greater than or equal to 18

Step-by-step explanation:

Answer:

x ≤ - 2

Step-by-step explanation:

- x/6 ≤ 3

- x/2 ≤ 1

- x ≤ 2

x ≤ - 2

find a ⋅ b
a = 7i - 4j, b = 4i + 3j

Answers

Answer:

28i^2 + 5ij - 12j^2

Step-by-step explanation:

(7i-4j)(4i+3j)

7i times 4i is 28i^2

7i times 3j is 21ij

-4j times 4i is -16ij

-4j times 3j is -12j^2

In equation it looks like this:

28i^2+21ij-16ij-12j^2

Simplify 21ij and -16ij

21ij-16ij is 5ij

So the answer is:

28i^2 + 5ij - 12j^2

Hope this helps!

Answer:

The answer is 16

Step-by-step explanation:

2.8 -3x =12.1 −6x what's x

Answers

X= 3.1 is the answer
The answer is X=3.1!

46 e 64 sao cemtena e unidade ​

Answers

Answer:

nn

Step-by-step explanation:

pq centena são de 100 dezena são de 10

Ex: 46 (dezena e unidade)

146 (centena, dezena e unidade)

True or False:
The relation shown is a function.

20 POINTS!!

Answers

Answer:

True

Step-by-step explanation:

For a relation to be a function each value of x must pair up with one and only one value of

The relation shown is a function.

Name all the quadrilaterals that have the given property.


two pairs of parallel sides and all angles congruent


a

rectangle, square

b

trapezoid

c

rhombus, square

d

rhombus

Answers

Answer:

A) rectangle and square

Step-by-step explanation:

Answer:

A) rectangle and square

Step-by-step explanation:

 

 Hope it work

Brainliest plz

I NEED MORE HELP PLSSS

Answers

The answer is the first one.

20 points!!

Find the value of y when x=9.
y=1- 2x

Answers

Answer: The answer is -17

Step-by-step explanation:

Brainlist Plz?

300 ml of pure alcohol is poured from a bottle containing 2 l of pure alcohol. Then, 300 ml of water is added into the bottle. Again 300 ml of the diluted alcohol is poured out and 300 ml of water is added into the bottle, Find the percentage of pure alcohol in the solution now.

Answers

Answer:

The present percentage of pure alcohol in the solution is 72.25% of pure alcohol

Step-by-step explanation:

The volume of pure alcohol poured from the 2 l bottle of pure alcohol = 300 ml of pure alcohol

The volume of water added into the bottle after pouring out the pure alcohol = 300 ml of water

The volume of diluted alcohol poured out of the bottle = 300 ml of diluted alcohol

The volume of water added into the bottle of diluted alcohol after pouring out the 300 ml of diluted alcohol = 300 ml of water

Step 1

After pouring the 300 ml of pure alcohol and adding 300 ml of water to the bottle, the percentage concentration, C%₁ is given as follows;

C%₁ = (Volume of pure alcohol)/(Total volume of the solution) × 100

The volume of pure alcohol in the bottle = 2 l - 300 ml = 1,700 ml

The total volume of the solution = The volume of pure alcohol in the bottle +  The volume of water added = 1,700 ml + 300 ml = 2,000 ml = 2 l

∴ C%₁ = (1,700 ml)/(2,000 ml) × 100 = 85% percent alcohol

Step 2

After pouring out 300 ml diluted alcohol from the 2,000 ml, 85% alcohol and adding 300 ml of water, we have;

Volume of 85% alcohol = 2,000 ml - 300 ml = 1,700 ml

The volume of pure alcohol in the 1,700 ml, 85% diluted alcohol = 85/100 × 1,700 = 1,445 ml

The total volume of the diluted solution = The volume of the 85% alcohol in the solution + The volume of water added

∴ The total volume of the twice diluted solution = 1,700 ml + 300 ml = 2,000 ml

The present percentage of pure alcohol in the solution, C%₂ = (The volume of pure alcohol in the 1,700 ml, 85% diluted alcohol)/(The total volume of the diluted solution) × 100

∴ C%₂ = (1,445 ml)/(2,000 ml) × 100 = 72.25 %

The present percentage of pure alcohol in the solution, C%₂ = 72.25%

Please help quick will give brainliest!

Answers

Answer: Choice A) There must be a vertical asymptote at x = c

Explanation:

The first limit [tex]\displaystyle \lim_{x\to c^{-}}h(x) = -\infty[/tex] says that as x approaches c from the left side, the f(x) or y values approach negative infinity. So the graph goes down forever as x approaches this c value from the left side.

The limit [tex]\displaystyle \lim_{x\to c^{+}}h(x) = \infty[/tex] means that as x approaches c from the right side, the y values head off to positive infinity.

Either of these facts are enough to conclude that we have a vertical asymptote at x = c. We can think of it like an electric fence in which we can get closer to, but not actually touch it.

Jaden is building a fence around his yard. He wants to know how much fencing he needs. His yard is shaped like a rectangle that is 96 feet long and
33 feet wide.
How many feet of fencing does Jaden need to buy? Enter the answer in the box.
feet

Answers

Answer:

258 ft

Step-by-step explanation:

area of the rectangle =96+33×2=258 ft

hope it helps you to

please mark me as brainlist

4(x + 3) = 3(3x - 1)​

Answers

Answer:

Either 4x+12 ≠ 9x-3 OR x = 3

Hope this helps!! (Please mark Brainliest if possible!!)

Answer:

[tex]x=3[/tex]

Step-by-step explanation:

[tex]4(x+3)=3(3x-1)[/tex]

Distribute 4 and 3 into the parentheses

[tex]4x+12=9x-3[/tex]

Combine like terms; subtract both sides by 12

[tex]4x+12-12=9x-3-12\\4x=9x-15[/tex]

Combine like terms; subtract both sides by 9x

[tex]4x-9x=9x-15-9x\\-5x=-15[/tex]

Divide both sides by -5 to isolate x

[tex]\frac{-5x}{-5} =\frac{-15}{-5} \\x=3[/tex]

I hope this helps!

cp=Rs6250 loss%=4% find sp​

Answers

Formula:
Selling price = Cost price x (1 - 4%)


Selling price:
= 6250 x (1 - 4%)

= 6250 x 96%

= 6250 x 96/100

= 6250 x 24/25

= Rs 6000

Hope it helps!

She needs altogether 2 2/4. that is 2 wholes and 2/4 fraction. if we consider using 1/4 cup, 1 whole is made of four quarter cups. Therefore 2 wholes require eight quarter cups. Then theres a remaining fraction of 2/4 which is equivalent to two quarter cups. 1/4 + 1/4 = 2/4. Therefore altogether 8 + 2 = 10 of the 1/4 cups are required for the recipe. 10 of 1/4 cups are needed is this right? Yes or no

Answers

Answer:

Yes

Step-by-step explanation:

According to the analysis;

There are four 1/4 cups in one whole

There are eight 1/4 cups in two wholes

Then the fraction 2/4 = 1/4 + 1/4 Hence there are two 1/4 cups in 2/4.

Altogether we have the fraction 2 2/4 as 8 + 2 = 10 measures of 1/4 cups

To confirm, 10 * 1/4 = 2 2/4

Therefore, the analysis is correct.

Sami has 12 Balloons . 2/3 of them are Green and the rest is Red balloons. What's is the ratio of Green to Red balloons

Answers

8:4 or 2:1 simplified

*Solve by Graphing* Greg went to the hardware store to buy bolts and washers. The bolts cost $0.55 each and the washers cost $0.07 each. George paid $2.41 for a total price of 7 pieces. How many of each item did he get?​

Answers

Answer:

He got 4 bolts and 3 washers

Step-by-step explanation:

Because 0.55 · 4 = 2.2

0.07 · 3 = .21

and put it together, 2.2 + .21 = 2.41

4x - 2y = 24
y=-3x - 2


someone help me?

Answers

Step-by-step explanation:

I've used substitution method over here and got the value of X and Y

Hi how is your day going

How can you use equations to solve real-world problems? PLZ

Answers

Answer:

you can use equations to find out how much tip you should give

construction is a big one!

I’m having a bit of trouble could someone please help me??

Answers

Answer:

1.Conduction

2.the second one

sorry if these are wrong

Step-by-step explanation:

Answer:

#1 Convection

#2 From the hot to the mug

At her restaurant, Yolanda opened 34 cans of tomato sauce. She needs to use 4 cans of sauce for one pan of lasagna. How many pans of lasagna could Yolanda make if she uses all of the cans? Write the answer as a mixed number.

Answers

she could make 8 and a half pans of lasagna

Step-by-step explanation:

so divide 34 and 4 you will get 17 / 2 so to make it into a mixed number divide it by 8 and it will 16 so 1 will be remaining so it will be 8 1/2 hope it helps :D

Other Questions
3. Triangle ABC is an equilateral triangle (all angles are equal and all side lengths are equal) and triangle CDE is a right triangle. If the length of side AE is 20 units, what is the length of side BD. A - 12 unitsB - 14 unitsC - 16 unitsD - 18 unitsE - 20 units A committee of nurse have been tasked with reviewing an increase in central line infections. explaint he process that they should follow Part 4: Arguing from EvidenceIndividually, write a complete CER paragraph below.The first sentence should be a statement that answers the Guiding Question: Which specific dyemolecule(s) gives each Skittle its color?Next, use observations from the bands on your gel as evidence to support your claim. Finally, explain why the evidence supports the claim (what scientific principles explain what you see ingel?) if x=15cm , does the laser beam refract back into the air through side b or reflect from side b back into the water? Material through which water readily flows is termed . A. Fluent B. Porous C. Permeable. C. Permeable. There are many farms that only grow pine trees. In the spring, seedlings are planted in rows that are ten feet apart. After four or five years, one-third of the trees are removed to give the others more room. Two or three years after that, another one-third are removed. Then, every other year the lower branches are cut away so that the trees' growth goes up and not out. Depending on the climate of the region, the trees may be harvested when they are between 20 and 35 years of age.What is the main structure used in the passage? 1. chronology 2. comparison . cause and effect4. problem and solution Should a contract for a sale of goods priced at $500 or more be in writing to be enforceable? explain "education is the most powerful tool to combat poverty and cridicate social injustice" the maid is not guilty, but the diamonds were stolen truth table what are the major concerns for corporations in developing and retaining expatriate employees, especially managers? Helium gas enters a compressor at 120 kPa and 250 K and to be compressed such that the outlet temperature is not greater than 600 K. Determine the maximum pressure that can be obtained at the outlet (kPa)Assuming: a) isentropic compression process, b) second law efficiency of 75%. (Note: Helium is a noble gas having constant specific heat and k = 5/3). direct imaging of exoplanets is currently most sensitive to: (a) rocky planets on close orbits. (b) rocky planets on wide orbits. (c) giant planets on close orbits. (d) giant planets on wide orbits. As a multi-disciplinary team, it is important that key personnel can provide input. Were the correct leaders invited to the discussion? A student who has studied Spanish for two years earns a score of 58 on the proficiency test. What is the difference between the student's actual score and the predicted score?1.16.002.9.863.4.654.15.55 Winnie worked for International Manufacturing and was trying to close a deal. To do so, she offered a $50,000 bribe to Gluseppe, the president of Italian Industries, a private corporation, to close the deal. This bribe was offered in Milan, Italy. Is this action in violation of the Foreign Corrupt Practices Act? a Multiple Choice Yes, because it was a bribe to a foreign Micial Yes, because it was a bribe in a foreign country a. Yes, because it was a bribe to a foreign official. b. Yes, because it was a bribe in a foreign country. c. No, unless the bribe was accepted by Giuseppe. d. No, because it was not a bribe to a foreign official A student has scores of 63, 65, and 73 on his first three tests. He needs an average of at least 70 to earn a grade of C in the class.What is the minimum score that the student needs on the fourth test to ensure a C? pl q6. what does the electric field look like within a parallel-plate configuration?pl q6. what does the electric field look like within a parallel-plate configuration? 1. Write a JavaScript function that takes a number as an input from the user, then prints out if the number a multiple of 11 or not. 2. Write a JavaScript function that takes a string, then counts how many Consonants in it. You need to consider capital case and small case letters. An electron is accelerated from rest to 3.0106m/s in 9.010^8s.A. What distance did the electron travel in this time interval?B.What is its average acceleration? The direction of the unit vector ^ is the direction of motion of the electron. Protect specific signs and trademarks that distinguish specific goods and services from other goods and services. 4 Multiple Choice X 00:55:15 Export Import property rights O Intellectual property rights O Industrial property rights O International property rights