What is the critical path?


Calculate the minimum overall project completion time and identify which activities are critical by filling out the chart below-forward and backward pass.

What is the maximum time to complete the projects?


Early start Early Finish late start Late finish Slack Critical path?


A
B
C
D
E
F
G
H


Please answer and thank you

What Is The Critical Path?Calculate The Minimum Overall Project Completion Time And Identify Which Activities

Answers

Answer 1

Answer:

yeeeee

Explanation:yeeees quen                   HI SISTERS HI SISTERS


Related Questions

Complete the sentence.
You can buy new applications at a retail store on DVD for ____.

O laptops
O smartphones
O tablets

Answers

Answer:

laptops

Explanation:

B

You can buy new applications at a retail store on DVD for laptops. Thus, option A (laptops) is correct.

What is a DVD?

A website is an accumulation of internet pages and related items that is posted on at least one server and given an unique domain name. Most blogs focus on a single subject or objective, such as reporting, education, industry, entertaining, or photo sharing.

A raster-based photograph designed for the web and publishing is stored as a JPG file. The JPG format is the default file format for image sensors and is the most widely used picture format on the web because of its universal compatibility and decompression. Portraits in both colour and black and white work brilliantly with them.

Therefore, option A (laptops) is the correct option.

Learn more about DVD, here:

https://brainly.com/question/13664390

#SPJ6

Is the flow of power reversible in a cam and follower

Answers

Answer:

No

Explanation:

The Cam and Follower's input movement is rotary, and it's output movement is reciprocating. ... The Cam and Follower's flow of power is not reversible, but it's direction of travel is reversible. Cam and Followers can be found in cam shafts.

Wrire a code that display elements at indices 1 and 4 in the follwoing array.

var userArray = [1, 6, 41, 8, 24, 4];

Answers

Answer:

Console.log(userArray[1]);

Console.log(userArray[4]);

Explanation:

The programming language was not stated; however, the variable declaration implies JavaScript.

JavaScript prints using the following syntax:

Console.log(print-name);

Since, the code is to print some elements of array userArray.

First, we need to determine the index of the elements.

The indices are given as 1 and 4.

So, the code to print these elements is as follows:

Console.log(userArray[1]);

Console.log(userArray[4]);


What is the Intranet?

Answers

Answer:

a local or restricted communications network, especially a private network created using World Wide Web software.

Explanation:

the intranet is in private Network based on internet standards but only available within a business or other organization.

Write code that read from variables N and M, multiply these two unsigned 32-bit variables and store the result in Variables P, Q. (

Answers

Answer:

Using C language;

#include <stdio.h>

int main()

{

int N, M;

printf("Please enter two numbers: ");

scanf("%d %d", &N, &M);

int P,Q = N*M;

return 0;

}

Explanation:

The variables N and M are declared and the "scanf" function is used to assign a value to the variables from the input prompt, then the product of N and M are saved to the P and Q variables.

True or false? The following deterministic finite-state automaton recognizes the set of all bit strings such that the first bit is 0 and all remaining bits are 1’s.

Answers

Answer:gjjjjjjjjjjjjjjjjjjjjjjjjjjjjjjjjjjjjjjjj

Explanation:

Write a C program to prform simple C aritlimetic calculations. The user is to enter a simple expression(integer operaior integer) such as 15+30=45. The program is to exlract the 2 operands and the operator, perform the indicated calculation and display the result. For examole15 + 30 = 45. Operators should includc t, -, * , l, and %'.Operands are prcsitive integers, no sign. Use getchar to input the cxpression. Allow for variable spacing before the first operand and between operators and operands.

Answers

Answer:

Here is the C program:

#include <stdio.h>  //to use input output functions

//functions prototype

unsigned int mod(unsigned int a, unsigned int b);  

unsigned int mul(unsigned int a, unsigned int b);  

unsigned int sub( unsigned int a,unsigned int b);

float divide(unsigned int a,unsigned int b);  

unsigned int add( unsigned int a,unsigned int b);  

int main()  {  //start of main method

unsigned int a, b;   //declare variables to store the operands

char d;  //declare variable to store the operator

printf("Enter an operator:  ");   //prompts user to enter an operator

scanf("%c",&d);  //reads the operator from use

getchar();  //gets a character

while (d!='q')   { //keeps iterating until user enters q to quit

printf("Enter 1st operand: ");   //prompts user to enter first operand

scanf("%d",&a);   //reads first operand from user

getchar();  //reads character

printf("Enter 2nd operand: ");   //prompts user to enter second operand

scanf("%d",&b);   //reads second operand from user

getchar();  

if (d=='%')  {   //if the character of operator is a mod

printf("%d",a);  //prints operand 1

putchar(d);  //displays operator

printf("%d",b);  //displays operand 2

printf(" = ");  //displays =

mod(a,b);  }  //displays computed modulo of two input operands

if (d=='*')   //if the input character is for multiplication operator

{printf("%d",a);  //prints operand 1

putchar(d);  //displays operator

printf("%d",b);  //displays operand 2

printf(" = ");  //displays =

mul(a,b); }  //displays computed multiplication

if (d=='+')  {  //if the input character is for addition operator

printf("%d",a);  //prints operand 1

putchar(d);  //displays operator

printf("%d",b);  //displays operand 2

printf(" = "); // displays =

add(a,b);  }   //displays computed addition

if (d=='/')  {  //if the input character is for division operator

printf("%d",a); // prints operand 1

putchar(d);  //displays operator

printf("%d",b);  //displays operand 2

printf(" = ");  //displays =

divide(a,b);  }   //displays computed division

if (d=='-')  {  //if the input character is for subtraction operator

printf("%d",a);  //prints operand 1

putchar(d);  //displays operator

printf("%d",b); // displays operand 2

printf(" = ");  //displays =

sub(a,b);  }  //displays computed subtraction

printf("Enter an operator: ");   //asks again to enter an operator

scanf("%c",&d);  //reads operator from user

getchar();  }  }   //gets character

unsigned int mod( unsigned int a, unsigned int b){  //function to compute modulo of two integers with no sign

     int c = a%b;  //computes mod

    printf("%d",c);  }  //displays mod result

unsigned int add(unsigned int a, unsigned int b){     // function to compute addition of two integers

    int c = a+b; //computes addition

    printf("%d\n",c);  } //displays result of addition

unsigned int mul(unsigned int a, unsigned int b){       //function to compute multiplication of two integers

    int c = a*b;  //multiplies two integers

   printf("%d\n",c); }  //displays result of multiplication

float divide(unsigned int a, unsigned int b){   //function to compute division of two integers

    float c = a/b;  //divides two integers and stores result in floating point variable c

    printf("%f\n",c);  } //displays result of division

unsigned int sub(unsigned int a, unsigned int b){       //function to compute subtraction of two integers

    int c = a-b;  //subtracts two integers

    printf("%d\n",c);  }  //displays result of subtraction

Explanation:

The program is well explained in the comments mentioned with each line of the program. The program uses while loop that keeps asking user to select an operator and two operands to perform arithmetic calculations. The if conditions are used to check what arithmetic calculation is to be performed based on user choice of operand and calls the relevant function to perform calculation. There are five functions that perform addition, modulo, subtraction, division and multiplication and display the result of computation. The screenshot of output is attached.

IT professionals have a responsibility to educate employees about the risks of hot spots. Which of the following are risks associated with hot spots? Check all of the boxes that apply.

third-party viewing

unsecured public network

potential for computer hackers

unauthorized use

Answers

Answer:

All of them

Explanation:

got it right on edge 2020

Answer:

All of the above

Explanation:

just do it

This diagram shows a number of computing devices connected to the Internet with each line representing a direct connection.
What is the MINIMUM number of paths that would need to be broken to prevent Computing Device A from connecting with Computing Device E?
A. 1
B. 2
C. 3
D. 4

Answers

Answer: C

Explanation: Computing Device A is connected using 3 wires, which all lead to multiple different paths of wires. If you break all the wires off of A, it leaves it with no paths to use. However, if you do this with E, there is 4 differents paths connected to it. Since you need the MINIMUM, the answer would be C.

Using the Multiple-Alternative IFTHENELSE Control structure write the pseudocode to solve the following problem to prepare a contract labor report for heavy equipment operators: The input will contain the employee name, job performed, hours worked per day, and a code. Journeyman employees have a code of J, apprentices a code of A, and casual labor a code of C. The output consists of the employee name, job performed, hours worked, and calculated pay. Journeyman employees receive $20.00 per hour. Apprentices receive $15.00 per hour. Casual Labor receives $10.00 per hour.

Answers

Answer:

The pseudo-code to this question can be defined as follows:

Explanation:

START //start process

//set all the given value  

SET Pay to 0 //use pay variable that sets a value 0

SET Journeyman_Pay_Rate  to 20//use Journeyman_Pay_Rate variable to sets the value 20

SET Apprentices_Pay_Rate to 15//use Apprentices_Pay_Rate variable to sets the value 15  

SET Casual_Pay_Rate to 10//use Casual_Pay_Rate variable to set the value 10

READ name//input value

READ job//input value

READ hours//input value

READ code//input value

IF code is 'J' THEN//use if to check code is 'j'  

  COMPUTE pay AS hours * JOURNEYMAN_PAY_RATE//calculate the value

IF code is 'A' THEN//use if to check code is 'A'

  COMPUTE pay AS hours * APPRENTICES_PAY_RATE//calculate the value

IF code is 'C' THEN//use if to check code is 'C'

  COMPUTE pay AS hours * CASUAL_PAY_RATE//calculate the value

END//end conditions

PRINT name//print value

PRINT job//print value

PRINT code//print value

PRINT Pay//print value

END//end process

what is the importance of human flourishing to science and technology?​

Answers

Explanation:

:*):*):*)*)*:)*:)*:*)*:**:*)*:)*:)*:*):*)*P:)*:*):*)

:*

):*

)*:

)*:*

):*):*)*:*):*)*:*):*):*):)*:*):*):*):*)

:*):*)

Java Eclipse Homework JoggerPro
Over a seven day period, a jogger wants to figure out the average number of miles she runs each day.

Use the following information to create the necessary code. You will need to use a loop in this code.

The following variables will need to be of type “double:”
miles, totalMiles, average

Show a title on the screen for the program.
Ask the user if they want to run the program.
If their answer is a capital or a lowercase letter ‘Y’, do the following:
Set totalMiles to 0.
Do seven times (for loop)
{

Show which day (number) you are on and ask for the number of miles for this day.
Add the miles to the total
}

Show the total number of miles
Calculate the average
Show the average mileage with decimals
Use attractive displays and good spacing.
Save your completed code according to your teacher’s directions.

Answers

import java.util.Scanner;

public class JoggerPro {

   public static void main(String[] args) {

       String days[] = {"Monday?", "Tuesday?", "Wednesday?", "Thursday?","Friday?","Saturday?","Sunday?"};

       System.out.println("Welcome to JoggerPro!");

       Scanner myObj = new Scanner(System.in);

       System.out.println("Do you want to continue?");

       String answer = myObj.nextLine();

       if (answer.toLowerCase().equals("y")){

           double totalMiles = 0;

           for (int i =0; i < 7; i++){

               System.out.println(" ");

               System.out.println("How many miles did you jog on " + days[i]);

               double miles = myObj.nextDouble();

               totalMiles += miles;

           }

           double average = totalMiles / 7;

           System.out.println(" ");

           System.out.println("You ran a total of " + totalMiles+ " for the week.");

           System.out.println(" ");

           System.out.println("The average mileage is " + average);

       }

       

   }

   

}

I'm pretty sure this is what you're looking for. I hope this helps!

Adjust list by normalizing When analyzing data sets, such as data for human heights or for human weights, a common step is to adjust the data. This can be done by normalizing to values between 0 and 1, or throwing away outliers. For this program, adjust the values by subtracting the smallest value from all the values. The input begins with an integer indicating the number of integers that follow. Assume that the list will always contain fewer than 20 integers. Ex: If the input is: 5 30 50 10 70 65 the output is: 20 40 0 60 55 The 5 indicates that there are five values in the list, namely 30, 50, 10, 70, and 65. 10 is the smallest value in the list, so is subtracted from each value in the list. For coding simplicity, follow every output value by a space, including the last one.

Answers

Answer:

I've implemented this program using python

userinput = int(input("Length: "))

mylist = []

mylist.append(userinput)

for i in range(1,userinput+1):

   userinp = int(input("Input: "))

   mylist.append(userinp)

smallval = mylist[1]

for i in range(1,len(mylist)):

   if smallval > mylist[i]:

       smallval = mylist[i]

for i in range(1,len(mylist)):

   mylist[i] = mylist[i] - smallval

for i in range(1,len(mylist)):

   print(mylist[i],end=' ')

Explanation:

I've added the full source program as an attachment where I used comments to explain difficult lines

The program written in python 3 deducts the least from a list of user given integers and prints the output. The program goes thus :

len_input = int(input())

#the number of inputs the user wishes to supply

vals = []

#initialize an empty list to accept the inputs

for i in range(1, len_input +1):

#use a loop to accept the user inputs

num = int(input())

#allow users to take in the inputs

vals.append(num)

#append each value to the list

least =min(vals)

#using the min function, obtain the lowest value from the list

output_vals = []

#initialize an empty list to hold the normalized values

for i in range(len_input):

#loop using a for loop

diff = vals[i] - least

#deduct the minimum value from each element in the list

output_vals.append(diff)

#append the values to the new list.

print(output_vals)

#display the output

A sample run of the program and the script is attached.

Learn more :https://brainly.com/question/14276852

Jason works as a financial investment advisor. He collects financial data from clients, processes the data online to calculate the risks associated with future investment decisions, and offers his clients real-time information immediately. Which type of data processing is Jason following in the transaction processing system?

A.
online decision support system
B.
online transaction processing
C.
online office support processing
D.
online batch processing
E.
online executive processing

Answers

Answer:

The answer to this question is given below in the explanation section.

Explanation:

The correct answer to this question is an online decision support system. Because the decision support systems process the data, evaluate and predict the decision, and helps the decision-makers,  and offer real-time information immediately in making the decision in an organization. So the correct answer to this question is the decision supports system.

Why other options are not correct

Because the transaction processing system can only process the transaction and have not the capability to make the decision for the future. Office support processing system support office work, while the batch processing system process the task into the batch without user involvement.   however, online executive processing does not make decisions and offer timely information to decision-makers in an organization.

Answer: the answer is A.

Explanation: He has to listen to what the people tell him and think about the information he has and make a choice on what to reply with.

Jason works as a financial investment advisor. He collects financial data from clients, processes the data online to calculate the risks associated with future investment decisions, and offers his clients real-time information immediately. Which type of data processing is Jason following in the transaction processing system?

A.
online decision support system
B.
online transaction processing
C.
online office support processing
D.
online batch processing
E.
online executive processing

Answers

Answer:

The answer to this question is given below in the explanation section.

Explanation:

The correct answer to this question is online decision support system. Because the decision support systems process the data, evaluate and predict the decision, and helps the decision-makers,  and offer real time information immediately in making the decision in an organization. So the correct answer to this question is the decision supports system.

Why other options are not correct

Because the transaction processing system can only process the transaction and have not the capability to make the decision for the future. Office support processing system support office work, while the batch processing system process the task into the batch without user involvement.   however, online executive processing does not make decisions and offer timely information to decision-makers in an organization.

Create a survey questionnaire with at least 10 questions to find out how teens are using social networking sites. Your data should contain a minimum of 30 valley questionnaires in each respondent must answer all the questions for that questionnaire to be valid. Analyze the data collected using charts or graphs. What are your findings from the survey? Collate the findings by summarizing the answers for each question. Present a graph or chart to represent the data you collected.

Answers

Possible Questions:

- What social media platforms do you use on a daily basis?

- Where did you hear about these social media platforms?

- What made you join these social media platforms?

- What social media platform(s) do you prefer the most?

- Why might you suggest these social media platforms to a friend?

- What does having and using this platform mean to you?

- What does your preferred platform allow you to do?

- Has using this platform changed you in any way? (Are you more connected, concerned, aware, etc.)

Need help with coding.
I'm trying to input a list that uses int(input("Element: ")) and it's causing an error. Anything to help with this?

Answers

You could try something likes this.

lst = []

n = int(input("Number of elements: ))

for i in range(0, n):

element = int(input("Element: "))

lst.append(element)

In __________ write, the data are stored in the cache, and control returns to the caller. Select one: a. a synchronous b. a buffered c. an asynchronous d. a non-buffered

Answers

Answer:

The correct answer to the question is option C (an asynchronous)

Explanation:

Computer store files in its temporary data storage space so as to facilitate easy retrievals when needed. Cache memory is in the temporary data storage space of the computer, faster than any other system memory so that when the processor requests information from the computer memory after a user place a command, the cache memory makes the information available in a short time when the data are required eliminating delay when ram will have to take time to fetch the data to provide to the processor.

In an asynchronous write, the data are stored in the cache to enable easy retrieval by the computer processor just as the cache is explained above, it allows writing data to the cluster. Asynchronous write also allows control returns to the caller.

is the core of an operating system that controls its basic functions.
O Freeware
O Kernel
Tweaker
O Open source

Answers

Answer:

Explanation:

Tweaker

ANSWER

Its Kernel

Explanation:

i got a 100%

What are the operating system roles?

Answers

Answer:

keep track of data,time

its the brain of the computer

what is the provincial capital of lumbini province​

Answers

Answer:

hope it helps..

Explanation:

Butwal(recently changed again) , Rupendhai District

what is a conditional format that displays a horizontal gradient or solid fill indicating the cell's relitive value compared to other selected cells

Answers

Answer:

Data bar

Explanation:

The answer to this question is data bar. Through the use of a day bar we are able to see trends in our data. They are very useful when it comes to visualization of values that are In a range of cells. Now if the bar is longer then the value we are visualizing is definitely higher. And if it is shorterr the value is lower. Several applications like excel has programmes that makes use of data bars especially for statistical purposes.

Write a program that simulates flipping a coin to make decisions. The input is how many decisions are needed, and the output is either heads or tails. Assume the input is a value greater than 0.

Answers

Answer:

import random

decisions = int(input("How many decisions: "))

for i in range(decisions):

   number = random.randint(0, 1)

   if number == 0:

       print("heads")

   else:

       print("tails")

Explanation:

*The code is in Python.

import the random to be able to generate random numbers

Ask the user to enter the number of decisions

Create a for loop that iterates number of decisions times. For each round; generate a number between 0 and 1 using the randint() method. Check the number. If it is equal to 0, print "heads". Otherwise, print "tails"

QUICK!! URGENT!! I'll provide more point if u give me the right code for this specific program. I truly don't understand if statements :( ​

Answers

Answer:

5467373737474737377474747

Which part of the formula is the argument?

=COUNTIF(A1:E59, "Greene City")

=

()

COUNTIF

A1:E59

Answers

Answer:

e on edege

Explanation:

just took the question on edge

Answer:

Guy above is right!

Explanation:

A ________helps to present data in a row and column format. ​

Answers

Answer:

Tally marks

Explanation:

Tally marks on the Tally table can help us to represent data in a row and column format. ​

If my answer helped, kindly mark me as the Brainliest!!

Thank You!!

Table

In a table the datas are arrange in rows and columns.

Kara's teacher asked her to create a chart with horizontal bars. Which chart or graph should she use?

Bar graph
Column chart
Line graph
Pie chart

Answers

Answer:

The answer to this question is given below in the explanation section.

Explanation:

The correct answer to this question is the Bar graph.

Because we use this chart type to visually compare values across a few categories when the charts show duration or when the category text is long.

However, we can present information similarly in the bar graph and in column charts, but if you want to create a chart with the horizontal bar then you must use the Bar graph. In an Excel sheet, you can easily draw a bar graph and can format the bar graph into a 2-d bar and 3-d bar chart.

A column chart is used to compare values across a few categories. You can present values in columns and into vertical bars.

A line graph chart is used to show trends over months, years, and decades, etc.

Pie Chart is used to show a proportion of a whole. You can use the Pie chart when the total of your numbers is 100%.

Answer:

Bar graph option A

Explanation:

I did the test

What is the proper syntax for writing a while loop in Python?

A. Begin the statement with the keyword repeat
B. End the statement with a colon
C. Place the test condition outside of parentheses
D. Use quotation marks around the relational operators

Answers

The proper syntax for while loops in Python are:

while (condition):

   #the code does something

Answer choice B is the only correct option because all while loops end with a colon.

Answer:

End the statement with a colon

Explanation:

I took the test and got it right.

For this assignment, you will create flowchart usingFlowgorithm and Pseudocode for the following program example:You are to design a program for Alexander’s Coffee Shopproviding customer research data. When a customer places an order,the clerk asks the customer for their zip code and age. The clerkenters this data as well as the number of items purchased. Theprogram should operate continuously until the clerk enters a 0 forthe zip code at the end of the day. If the clerk enters an invalidage (defined as less than 10 or more than 100), an error message isdisplayed and the program re-prompts the clerk continuously toenter a valid age. At the end of the program, display the averagecustomer age as well as counts of the number of items ordered bycustomers under the age of 25 and customers 25 and older.

Answers

Answer:

The flowchart is attached

Oredered accordinly with the flowcahrt number

Write code that Uses the range() in a for loop to iterate over the positions in user_names in order to modify the list g

Answers

Answer:

Explanation:

The range() function is a built-in function in the Python programming language. In the following code, we will use this function to iterate over all the positions in the array called user_names and add them to the list g. (assuming that is what was meant by modifying the list g)

for i in range( len(user_names) ):

   g.append(user_names[i])

This simple 2 line code should do what you are asking for.

Other Questions
f(x) = x^3- 9xWhat is the average rate of change of f over the interval [1, 6] How do I solve this?(tangent segment) Rectangle ABCD has a perimeter represented by the expression 9x + 3. Rectangle PQRS has aperimeter represented by the expression 6x + 2. Write the expression that represents thedifference in the perimeters of Rectangle ABCD and Rectangle PQRS. Write the steps andsolution. what is the translation of the expression 5 more than twice x Why are improved old age pensions such an important part of Indias policy? 324 soldiers queued up such that the number of queues is equal to the number of soldiers in each queue. find the number of queues What is 13 / 143 as a unit fraction a little boy gets a haircut.the total cost is $24 and the tip should be 10% how much should the barber get as a tip? Cascade Company was started on January 1, 2016, when it acquired $60,000 cash from the owners. During 2016, the company earned cash revenues of $35,000 and incurred cash expenses of $18,100. The company also paid cash distributions of $4,000.Required:Prepare a 2016 income statement, capital statement (statement of changes in equity), balance sheet, and statement of cash flows under each of the following assumptions.a. Cascade is a sole proprietorship owned by Carl Cascade.b. Cascade is a partnership with two partners, Carl Cascade and Beth Cascade. Carl Cascade invested $24,000 and Beth Cascade invested $36,000 of the $60,000 cash that was used to start the business. Beth was expected to assume the vast majority of the responsibility for operating the business. The partnership agreement called for Beth to receive 60 percent of the profits and Carl to get the remaining 40 percent. With regard to the $4,000 distribution, Beth withdrew $2,400 from the business and Carl withdrew $1,600.c. Cascade is a corporation. It issued 5,000 shares of $5 par common stockfor $60,000 cash to start the business. how do i put 5x^2+6+3xy^5-2x in standard form Find the x - and y - intercepts of the graph of the linear equation-4x+8y=-16 HELP DUE INNA MINTUE_______________________ is the sharing of power between federal and state governments.( Write a positive or negative integer that represents the situation.An elevator goes down 8 floors. Explain the difference between being on the pro side and con side. How can you recognize which side an argument is on? simplest radical form -5243-327 Which sentence containsa gerund phrase? Is this a function or no How he became trongsa poenlop Ugyen Wangchuck types of transformation Rember the people who got us through stuff lil peep, juice wrld, xxtentacton